February 13, 2019

GoldSim 12.1 Update 2 - Summary

Posted by Jason Lillywhite


We just released GoldSim 12.1 Update 2, which includes some noteworthy features even though it is labeled a "minor update". In this blog post, I will briefly describe some of them.


February 12, 2019

Run-of-the-River Hydroelectric Power Generation

Posted by Jason Lillywhite



A new model was added to our library that simulates run-of-the-river hydroelectric power generation. This model simulates a dam that is operated at a constant water level with insignificant amount of storage compared to the daily flow through. It is based on work by one of our expert modelers for a project on the Aksu River, located in northeastern Turkey. Below is a picture showing the dam that this model was originally created for.